Main contractor or design and build: which route suits your project?
Two common ways to appoint a builder in the UK, compared on design responsibility, cost certainty, control and programme.
Our joinery company, HM Joiners Ltd, is accredited by
Westmark works under both routes. See our pages on main contractors in London and design and build contractors in London.
Before you appoint a builder for a substantial project, you need to decide how the design and the construction will be arranged. That choice, called the procurement route, decides who is responsible for the design, when the price becomes reliable, and how much say you keep over the details. In the UK, most private projects follow one of two routes: traditional main contracting or design and build.
The traditional route: appointing a main contractor
With the traditional route you appoint your own design team first: an architect, a structural engineer and, on larger projects, mechanical and electrical engineers and a quantity surveyor. They develop the design in detail. Contractors then price that design, and the one you choose builds it as main contractor.
Your design team works for you throughout, and the contractor is responsible for building what has been drawn and specified. Because the design is largely complete before work starts, the price is based on detailed information, and you keep close control over every design decision. The trade-off is time: the design has to be developed before the build can be priced, and changes during construction are recorded as variations to the contract.
Design and build
With design and build, one contractor is responsible for both completing the design and carrying out the work. You set out what you need in a brief, usually called the employer's requirements. It can be anything from a short description to a developed concept by your own architect. The contractor responds with proposals and a price, then develops the detailed design and builds it.
Design and construction overlap, so the overall programme can be shorter, and one party answers for the whole result. You hand over more of the detailed design decisions, so a clear brief matters. On many projects the client's architect is "novated": they design the concept for the client, then transfer to the contractor's team to complete the detail.
The two routes side by side
| Main contractor (traditional) | Design and build | |
|---|---|---|
| Who is responsible for the design | Your design team | The contractor, from the brief onwards |
| When the price is reliable | After detailed design, before work starts | Agreed against the brief and proposals, earlier in the process |
| Your control over details | High: your designers decide | Set by the brief; the contractor develops the rest |
| Programme | Design, then tender, then build | Design and build overlap |
| Common UK contract | JCT Standard Building Contract, or Intermediate for simpler work | JCT Design and Build Contract |
When the traditional route suits
- The design matters in detail, as with a high-end home, a listed building or a refurbishment where every finish is specified.
- You already have an architect you want to lead the project.
- You want a price based on complete information before committing.
If you already have a design team, see how we work as main contractors in London.
When design and build suits
- You want one party answerable for both design and construction.
- Time is tight and design and construction need to overlap.
- The project is defined more by performance and budget than by every visible detail, as with many commercial fit-outs.
If that describes your project, see how we work as design and build contractors in London.
The routes in between
Many projects use a mix. A contractor can be appointed early to advise on cost and buildability while your design team finishes the design, which is sometimes called a two-stage approach. Or your architect can take the design to planning and then be novated to a design and build contractor. The right answer depends on how far your design has progressed, how much risk you want to hold and how quickly you need to be on site.
What to have ready before you speak to a contractor
- Drawings or a brief, at whatever stage they are
- The site address and its current condition
- Your budget range and the date you need the work finished
- Any approvals already granted or applied for
Not sure which route suits your project? Tell us where the design stands.
Start my enquiryAlso in our guides: Cat A and Cat B fit-out explained.