Hotel refurbishment and fit-out contractors

.

Our joinery company, HM Joiners Ltd, is accredited by

What a hotel refurbishment involves

  • Operatives installing the suspended MF ceiling grid and feature bulkhead
    MF ceiling grid and feature bulkhead Food hall fit-out, The Whiteley, Queensway
  • Services boxed in with timber framing and boarding beneath ductwork and fan coil units
    Framed partitions and boxing-in around services Food hall fit-out, The Whiteley, Queensway
  • Stud partitions with high-level boarding and a mobile scaffold tower
    Wall framing and high-level boarding Food hall fit-out, The Whiteley, Queensway
  • Wide view of the ground floor fit-out with timber stud partitions, blue boarding, copper pipework, spiral ductwork and a scissor lift by the shopfront
    Ground floor: partitions, ductwork and pipework in place Food hall fit-out, The Whiteley, Queensway
Photograph 1 of 4

We are hotel refurbishment and fit-out contractors working in London and the Home Counties. A hotel renovation is phased floor by floor so rooms stay on sale and guests are not disturbed.

A hotel refurbishment renews the parts of the building guests see and the services they rely on: bedrooms and bathrooms, corridors, reception, restaurants and bars, with the wiring, plumbing, ventilation and fire safety work behind them. A hotel fit-out does the same in a new or converted building, from the shell to opening.

Hotels earn from every room, every night, so the programme matters as much as the finish. We plan the work in blocks of rooms or whole floors, agree quiet hours and separate routes for materials and waste, and build a sample room first so that the design and the price are settled before the roll-out. Fitted furniture and joinery can be made by our sister company, HM Joiners Ltd, to the same programme. The photographs on this page are from our current food hall fit-out at The Whiteley, Queensway.

How we approach hotel refurbishment

  • Plan around occupancy

    The programme follows your booking calendar, taking rooms out of service in blocks and returning them on agreed dates.

  • Prove it in a sample room

    A sample room settles the design, the details and the cost before the roll-out begins.

  • Control noise and dust

    Working hours, protected routes and separate access keep the work away from guests and front-of-house.

  • Finish in repeatable stages

    Each floor follows the same sequence, so quality and timing are consistent from the first room to the last.

What hotel refurbishment can include

  • Guest bedrooms and en-suite bathrooms
  • Receptions, lobbies and corridors
  • Restaurants, bars and kitchens
  • Back-of-house and staff areas
  • Mechanical, electrical and fire safety upgrades
  • Fitted furniture and bespoke joinery

The final scope, responsibilities and programme are agreed for each project.

Questions about hotel refurbishment

All questions
Can the hotel stay open during the refurbishment?

In most cases, yes. Rooms are taken out of service a block or a floor at a time, with noisy work limited to agreed hours and kept away from occupied rooms.

What is a sample room?

A sample or mock-up room is one bedroom completed in full before the main works. It lets the owner, operator and designer approve the design and details, and gives a firm basis for the cost of the remaining rooms.

Do you fit out restaurants and bars inside hotels?

Yes. Hotel restaurants, bars and kitchens are fitted out in the same way as standalone ones. Our restaurant and bar fit-out page explains how that work is planned.

See restaurant and bar fit-out.

Tell us about your project

.

Westmark London Construction

Make an enquiry Call us Email us