Cat A and Cat B fit-out explained
What each stage of an office fit-out includes, who usually pays for it, and how to avoid paying for work twice.
Our joinery company, HM Joiners Ltd, is accredited by
Westmark carries out this work. See our pages on office fit-out in London, office refurbishment in London and commercial fit-out contractors in London.
If you are taking on office space in London, the terms Cat A and Cat B, short for Category A and Category B fit-out, will appear in the agent's particulars, the lease and every contractor's proposal. They describe how far a space has been fitted out, and they decide what you are paying the landlord for and what you will pay to make the space your own. They are industry conventions rather than legal definitions, so the exact content always depends on the building and the lease.
Shell and core: the starting point
A shell and core space is the building without the tenant areas finished. The structure, the outside walls and roof, the lifts, stairs, toilets and common parts are complete, and the main services run to each floor. The office floors themselves are usually bare: concrete floor, exposed soffit, no ceilings and no lighting. Some larger occupiers take space in this state so that their own fit-out is built once, to their own design.
What a Cat A fit-out includes
A Cat A fit-out is the landlord's base fit-out. It turns the shell into a clean, open floor that is ready for an occupier to finish. A typical Cat A floor includes:
- raised access floors, so power and data can run underneath
- suspended ceilings and general lighting
- heating, cooling and ventilation to the open floor
- fire detection and alarm systems, and emergency lighting
- finished toilets, lift lobbies and common areas
- basic power distribution to the floor
What it does not include is anything that makes the space usable for a particular business: there are no meeting rooms, no kitchen, no reception and no furniture.
What a Cat B fit-out includes
A Cat B fit-out is the occupier's fit-out, built on top of Cat A. It is designed around how the business works and usually includes:
- partitions, meeting rooms, private offices and phone booths
- kitchens, tea points and breakout areas
- a reception area
- adjustments to lighting, heating and cooling to suit the new layout
- small power and data to desks and rooms, and audio-visual equipment
- floor finishes, decoration, bespoke joinery and branding
- furniture
Cat A+ and fitted space
Some landlords now go further than Cat A and offer fitted or "Cat A+" space: meeting rooms, a kitchen and furniture are already in place, so a tenant can move in quickly. It suits smaller occupiers and shorter leases. The trade-off is that the layout is the landlord's, not yours, and changing it later is a Cat B project in its own right.
Who usually pays for what
As a rule, the landlord pays for shell and core and Cat A, and the tenant pays for Cat B. That split is negotiable. Incentives such as rent-free periods or a contribution towards the fit-out are common, and the lease will also say what condition the space must be returned in at the end, which is known as reinstatement or dilapidations. Ask your agent and solicitor to check both before you sign, because returning a heavily altered floor to Cat A at the end of a lease can be a significant cost.
How to avoid paying for work twice
A Cat A ceiling and lighting layout is designed for an open floor. When the Cat B partitions go in, parts of it often have to be moved or replaced. If you are committing to a space before the landlord has finished the Cat A works, it is worth asking whether those works can be adjusted to suit your layout, or whether the landlord will contribute the value of the Cat A works so that your contractor builds one fit-out straight to your design. Either can save cost, time and waste.
What sets the programme
It depends on the size of the floor, the condition of the building, the landlord's approval process and the lead times for items such as glazed partitions, joinery and furniture. Lease dates are usually fixed, so the programme for a Cat B fit-out is normally planned backwards from the date you need to move in.
Questions to ask before you commit
- What exactly is included in this building's Cat A, floor by floor?
- Does the landlord need to approve the fit-out, and how long does that take?
- Are there rules on working hours, deliveries and noise?
- What does the lease require at the end of the term?
- Is there a landlord contribution, and is it tied to particular works?
Answering these early keeps the design, the cost and the programme realistic from the start.